Offshore/subsea systems

Subsea Development Challenges Overcome in the Mero Field

The paper details subsea system development for the Mero field and how operation of Mero’s early production system influenced the final configuration for all Mero projects.

Mero projects.
Fig. 1—Mero projects.
Source: OTC 32705.

The complete paper presents the technological achievements in the subsea scope of the Mero field development. Mero is the third-largest presalt field and the first developed under a production sharing contract (PSC). The paper details the subsea system development for the Mero field that was recognized with the Distinguished Achievement Award by OTC Brazil and how Mero early production system (EPS) operation influenced the final configuration for all Mero projects. The paper also presents the technical challenges that had to be overcome to initiate production successfully.

Introduction

The Libra block is approximately 180 km from Rio de Janeiro in ultradeep water of the Santos Basin varying from 1700 to 2400 m, under a presalt layer. The prospect area is close to 1500 km2. The reservoir fluid has a gas/oil ratio (GOR) of 440 sm3/sm3 and CO2 content in gas varying from 40 to 45% in volume.

×
SPE_logo_CMYK_trans_sm.png
Continue Reading with SPE Membership
SPE Members: Please sign in at the top of the page for access to this member-exclusive content. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community to gain full access.