field development
-
This paper illustrates a case study from a greenfield oil development in Sarawak that is planned for a fit-for-purpose development scope to create value and develop oil resources in a phased manner within 4 years of project framing.
-
This paper aims to optimize well trajectories in offshore reservoir development by applying a Pareto-based multiobjective approach.
-
This paper presents a reduced physics-based model that accelerates the ability to screen infill-location optimization, using the fast marching method to maximize production for a reservoir with multiple realizations.
-
SponsoredEffective data analysis depends on seeing connections that matter. Explore how Spotfire enables a more intuitive approach to understanding petroleum data.
-
The deal targets increased investment and production from one of the country’s largest onshore developments.
-
The Norwegian major said it is using artificial intelligence for predictive maintenance throughout its facilities and for interpretation of seismic data from the Norwegian continental shelf.
-
The new development is estimated to hold 46 million bbl of recoverable oil and is planned to start up in late 2028.
-
The project in the US Gulf is expected to add about 15,000 BOEPD to the deepwater Atlantis project at peak production.
-
First oil is expected from Phase 1 of the project in 2028, with up to four more phases planned.
-
This paper reviews lean construction management processes adopted in the Apani Field development, from facility design to construction management and drilling-location preparation.
Page 1 of 4