Hebron field
-
The C-NLOPB has green-lit the supermajor’s plans to develop new sands within the field’s Jeanne d’Arc formation.
-
The Hebron platform was successfully installed on the Grand Banks offshore Newfoundland and Labrador in June 2017. It consists of a single-shaft concrete gravity-based structure (GBS) supporting an integrated drilling and production topsides.
-
This paper discusses ExxonMobil’s focus on the next phase of its safety journey through advancement of individual awareness and decision making to help drive breakthroughs in the operator’s vision of safety.
-
The Hebron field off the east coast of Canada has begun production 37 years after it was discovered. Production is expected to peak at 150,000 B/D and ultimately yield about 700 million bbl of oil over the field's life.