Heerema
-
The job will increase the Heerema vessel’s second main hoist capacity by 1200 mt.
-
DNV GL awarded Heerema Marine Contractors Statements of Feasibility for two concepts designed to reduce the noise of offshore structure installation.
-
Topsides for the Peregrino C Platform in the Campos Basin offshore Brazil was installed by the world’s largest crane vessel, Heerema’s Sleipnir.
-
The BigRoll Bering was spotted leaving Corpus Christi, Texas, on 17 November, headed for the Peregrino heavy-oil field offshore Brazil. Drilling modules and a flare boom are being transported for the field’s Phase 2 development.