Petrobras
-
This paper presents an overview of the operator’s Marlim and Voador fields revitalization project, highlighting features and main achievements in the context of Campos Basin redevelopment.
-
The planned use of an uncrewed surface vessel to inspect shallow-water infrastructure for Petrobras follows a previous remote operation survey for the operator.
-
A dozen new platform supply vessels will be supplied by Bram Offshore and Starnav Serviços Marítimos.
-
If the find is commercially viable, the company and its partners say a subsea-to-shore development plan could produce first gas as early as 2027.
-
This paper presents the operator’s learnings in evaluating the routine of a floating production, storage, and offloading asset crew to identify scenarios for the application of robotics in day-to-day offshore activities.
-
Updates about global exploration and production activities and developments.
-
FPSO to be connected to high-pressure subsea separation technology pilot project.
-
Petrobras said the unit serving the pre-salt field is designed to reduce up to 24% of emissions.
-
A government-imposed limit on gas reinjection aimed at fueling domestic growth risks cooling future investor interest in Brazil’s offshore.
-
This work presents the results of several failure analyses of gas lift valves retrieved from subsea wells that were unable to prevent backflow from tubing to annulus
Page 1 of 11