Williston Basin
-
This paper reports the completion of a two-lateral well in the Williston basin where produced water (PW), filtered but otherwise untreated, was used throughout the slickwater and crosslinked components of approximately 60 hydraulic-fracturing stages.
-
With the surge in activity in the Williston basin, the ability to optimize completions has mainly been an expensive trial-and-error system.
-
Over the years, hybrid systems have been installed in horizontal wellbores to increase the number of compartmental sections for hydraulic fracturing because of the limitations of ball-actuated fracture sleeves. Experimenting with hybrid systems provides operators with the ability to optimize spacing of fracture stages along the horizontal section when sleeve technolog…
Page 2 of 2