Wood Group
-
Wood will provide the FEED and design for the offshore project. First oil is anticipated in 2024.
-
As part of the contract, Wood will provide the topside modifications needed for the Snorre A and Gullfaks A platforms to integrate the Hywind floating wind park with existing systems powering the facilities. The platforms will be the first to receive electric power from floating wind turbines.
-
Virtual metering technology has been in use for years as a cost-effective means of monitoring production, but what else can it do? How reliable is it as a backup to physical multiphase meters?
-
Wood and KBR inked a multimillion-dollar contract to deliver integrated front-end engineering design (FEED) for Shell Australia's Crux project to build a not-normally-manned (NNM) platform and gas export pipeline located approximately 600 km north of Broome, offshore Western Australia (WA). The Crux field water depth is 110 to 170 m.
-
The execution of process automation projects depends on the completion of tasks that are not necessarily related to automation, hampering project development timelines. How do automation solutions, such as digital twins, help to overcome these challenges?
Page 2 of 2