Completions
Output is rising fast in the South American shale play and putting Argentina on a course to soon reach 1 million B/D.
This case study presents a procedure in which the operator compared production from wells with adjusted wettability to a control group, finding that the adjustments resulted in significant improvements in production and reductions in produced water.
This paper presents a study that confirms glass-reinforced-epoxy-lined tubing as a reliable, cost-effective solution for long-term water-injection service in moderate-salinity offshore environments.
-
One study is showing that when pumping a proppant into a fracture, a little bit of extra effort might increase performance.
-
As activity plummeted to record lows, we witnessed a calibration of completion strategies. Whether it was further optimization of the preferred completion technique, implementation of new technologies, or a complete shift in completion philosophy, no stone was left unturned.
-
This paper documents the success story of the first quadlateral completion for an Alaskan operator by use of stacked, rotatable, Technical Advancement for Multilaterals Level-3 junction systems.
-
In this study, the authors demonstrate a reliable, cost-effective methodology that empowers shale operators with reservoir data on every well.
-
With the objective of increasing its production to 4.0 million BOPD, the Kuwait Oil Company (KOC) is developing its fields with optimum technology solutions.
-
Although early inflow control devices and intelligent completions (ICs) were introduced almost 20 years ago, completion technology has not kept pace with advancements in drilling technology.
-
This paper describes a comprehensive field study of eight horizontal wells deployed in the stacked Niobrara and Codell reservoirs in the Wattenberg Field (Denver-Julesburg Basin).
-
A long-time energy industry executive and chemical engineer has built a new water treatment system that he says can increase recovery rates from shale wells without using chemicals and will recycle all the water used in the process.
-
Openhole multistage (OHMS) systems are more cost-effective than the cemented casing plug-and-perf (CCPP) techniques for increasing production and reducing development costs.
-
Well control is built around huge steel machines, but the future of the business is digital. Data have become a critical asset as operators and service companies work to increase the safety and reliability of their products and operations.