Directional/complex wells
This paper aims to establish a set of best practices for generating particle-size-distribution data from core samples.
A shared digital mindset across subsurface, subsea, and drilling and wells is accelerating well planning at Vår Energi.
This paper presents findings reinforcing the argument that acid fracturing is a strong alternative stimulation method to improve productivity in the Austin Chalk formation.
-
Range Resources' drilling head talks about how the company went from drilling the shortest laterals in the Marcellus to the longest and why.
-
The Apollonia tight-gas chalk play is located in the Abu Gharadig Basin in the Western Desert of Egypt. This has long been ignored as a gas play in the overburden, while the Jurassic and Cretaceous oil fields deeper in the basin have been explored and developed.
-
Plug-and-abandonment (P&A) operations can be expensive, leading to negative net present value. Historically, P&A operations in the North Sea—estimated to hold some 3,000 wells of declining production—were performed with either drilling or workover rigs.
-
The complete paper describes a recent directional coiled-tubing drilling (DCTD) job completed for an independent operator in the Appalachian Basin.
-
This paper discusses the successful design, laboratory testing, and performance of an innovative, low-solids, organophilic-clay-free invert-emulsion fluid (OCF-IEF) used to drill the reservoir section of an extended-reach-drilling (ERD) well.
-
Current long-reach technology already has a large effect on oil recovery. Many possible improvements, however, remain, and we see new contributions every year.
-
The Peregrino project, located in the post-salt zone of the Campos Basin, presents immense challenges for drilling extended-reach wells. This paper shares challenges imposed by the well profile and downhole environment on the design and execution phases.
-
This paper presents a concept that enables simultaneous drilling and completion, with an aim to extend well reach substantially and with an ultimate objective of constructing 30-km-long production wells.
-
A producer and a service company have collaborated to develop a downhole system to merge multilateral technology and intelligent completions to create “smart laterals.”
-
Advancements in extended-reach drilling continue from the ExxonMobil-operated Sakhalin-1 project. The latest “super complex” horizontal well stretches 15,000 m, which partner Rosneft says is a “world record.”