Drilling
This paper presents a study that confirms glass-reinforced-epoxy-lined tubing as a reliable, cost-effective solution for long-term water-injection service in moderate-salinity offshore environments.
This paper aims to assess the effectiveness of using advanced integrated production-data-analysis techniques for condensate-rich tight gas fields.
Output is rising fast in the South American shale play and putting Argentina on a course to soon reach 1 million B/D.
-
This paper discusses the first multilateral well with a Level-4 junction combined with an inflow-control device (ICD) planned, designed, and drilled in the Upper Burgan reservoir of Raudhatain field, north Kuwait.
-
As with other MPD systems, SMD technology offers early detection of influxes (kicks) and minimizes downhole losses to weak subsurface formations.
-
Implementation of new technology can require that leadership and key team members be willing to step outside their comfort zones.
-
The work presented combines a fundamental-physics approach with field data to identify the root cause of drilling failures in Paleocene and Eocene injectite-sand intervals.
-
Large areas of the North Sea contain Cretaceous sediments, which form a massive hard layer of chalk that historically has presented a major drilling risk and expense to operators in the area.
-
The inventor of a new water-based drilling fluid believes the chemical process involved with his technology opens up natural fractures as drilling takes place to increase production in shale formations.
-
On the basis of safety performance results achieved through automation downstream, an operator set out to achieve the same advances in its upstream business.
-
Seminole Services’ Powerscrew Liner System is a new expandable-liner hanger that is set with torsional energy from the topdrive.
-
Australian technology developer MezurX is touting its newly introduced flow, density, and mud monitoring system as a significantly better alternative to the widely used Coriolis meter.
-
The standard for progress in shale development has been the drastic reduction in the number of days needed to drill a well, from more than 20 to less than 5 in some unconventional plays. But some question whether it has become a misleading metric for an industry needing more productive wells.