Field/project development
Known as Arena, the collaboration aims to improve decision-making across increasingly complex reservoirs and growing volumes of subsurface data.
The Absheron gas field expansion will supply additional natural gas to Azerbaijan’s domestic market and support its export commitments to Turkey, allowing Baku to stay focused on meeting its gas export obligations to Europe.
With $9.6 billion in assets in the market, the focus is shifting from who is exiting Southeast Asia to who is positioning for entry through acquisition, according to Rystad Energy.
-
The largest natural gas field in the rising Eastern Mediterranean region is now flowing after being discovered a decade ago.
-
First oil from the 120,000-B/D Liza Destiny FPSO is flowing ahead of schedule.
-
The startup of the deepwater field marks the beginning of production from the massive Stabroek Block, which contains an estimated 6 billion BOE. ExxonMobil estimates that at least 5 FPSOs will be producing more than 750,000 BOPD from the Stabroek Block by 2025.
-
Chevron has awarded Subsea 7 with a “sizeable” contract for subsea installation services at the St. Malo field in the US Gulf of Mexico. The scope of work will include project management, engineering, procurement, construction, and installation of the multiphase pump system at the field. It will also include a 14-mi water injection flowline system and the water inject…
-
The unmanned development is expected to add 80 million BOE of production to the aging Norwegian North Sea field. Aker BP said it aims to produce 1 billion BOE from Valhall over the next 40 years.
-
With production set to begin from the large Leviathan field by the end of this year, the Israeli government signed off on the final permits to allow for its first exports. Leviathan contains approximately two-thirds of all the gas resources discovered offshore Israel so far.
-
The Australian operator's A-6 offshore development, Myanmar's first ultradeepwater project, will supply gas to the country's domestic market, with some gas from Phase 1 also moving via pipeline to Thailand.
-
Chevron has signed a deal with Daewood Shipbuilding and Marine Engineering (DSME) to build a hull for the semi-submersible floating production (FPU) unit at its Anchor projec tin the US Gulf of Mexico. The contract maked the South Korean shipyard's first platform order in 5 years.
-
The Anchor development in the US Gulf of Mexico is the first ultra-high-pressure project requiring 20-ksi operating pressure to reach a final investment decision.
-
Total will invest $650 million in the development of two main projects, North Gialo and NC 98, resulting in a 180,000-B/D increase in production.