HSE & Sustainability
Block Energy announced the completion of its carbon capture and storage pilot study, confirming the viability of the field for permanent carbon storage.
DNV awarded the Abu Dhabi National Oil Company a storage certificate at the endorsement stage for its West Aquifer site.
Four former gas-producing wells have been converted into injection wells and are now preparing to receive carbon dioxide for storage.
-
As the cost to source, transport, store, treat, and dispose of water remains relatively high, water management programs will become a greater priority in the coming year.
-
There is widespread acceptance that extraction industries—including oil and gas—improve people’s lives and enable the economic growth of countries. However, at the project level, this acceptance is neither automatic nor unconditional.
-
The US Department of Justice and the Alaska Department of Law recently closed federal and legal actions against ExxonMobil Corp. and its corporate predecessors involving the 1989 crude oil spill from the Exxon Valdez oil tanker.
-
The authors have developed an active acoustic automatic leak-detection sonar designed to detect hydrocarbon leaks (mono- and multiphase oil and gas) at significant ranges, allowing coverage of wide areas from a single sensor.
-
Without serious climate policy restrictions, the use of cheaper oil will likely grow and extend its life expectancy throughout the global energy system.
-
Analyzing accidents can demonstrate how much they have in common with everyday operations. Business principles and sound engineering practices can be at odds.
-
Seismic innovators are working on new sound sources designed to produce better subsurface images while addressing concerns raised by scientists and regulators about the environmental impact of the related noise on sea life.
-
In the interest of conservation and sustainability, it is highly desirable to maximize any opportunity to reuse the produced water for subsequent fracturing treatments.
-
This paper reports the completion of a two-lateral well in the Williston basin where produced water (PW), filtered but otherwise untreated, was used throughout the slickwater and crosslinked components of approximately 60 hydraulic-fracturing stages.
-
This paper details the experience of using new stabilized crosslinked-fracturing-fluid systems in the Permian Basin using borated produced water.