Asset Management
The Houston-based developer of AI-powered submersible robotics earned the Best in Show Award and a $10,000 prize.
Industry fundamentals continue to strengthen as rising utilization and scarce replacement capacity support higher rig valuations.
The GRMS system of standardization and classification for geothermal resources, led by a coalition of stakeholders in collaboration with Project InnerSpace and the Society of Petroleum Engineers, will be published in November.
-
Panelists from energy companies around the globe gathered to share their personal and company’s experiences in community engagement.
-
SponsoredThe data that comes with mapping flow behavior at the stage level of unconventional wells was once accessible only through the installation of costly and intrusive diagnostic methodologies like fiber optic or running production logging. New-generation FloTrac ultrahigh-resolution nanoparticle tracer technology with subatomic spectroscopic measurement techniques now de…
-
The discovery in Putumayo could benefit from nearby existing infrastructure.
-
The Anita Garibaldi was built by MODEC and will produce Marlim and Voador together with FPSO Anna Nery, already in operation.
-
Mukuyu-1 sidetrack proves a working hydrocarbon system in the Cabora Bassa basin.
-
Wellesley estimates that the drilling campaign has proved a developable gas-condensate accumulation of 60 to 100 million BOE.
-
The Uganda oil project envisions drilling more than 450 wells on 35 well pads, leading to an estimated production of 230,000 BOPD at its peak once production starts up.
-
The next phase of drilling is expected to resume in mid-2024 and includes several sidetrack wells, long-reach directional wells, and stratigraphic exploration wells.
-
Challenges to development, including costs, cited as reasons for turning back the acreage.
-
Jackup rig Borr Norve has started drilling operations on the project’s fourth production well, DHIBM-6H.