Asset Management
The company’s millimeter wave drilling system is approaching a depth of 1 km at its Central Texas site. The recent funding is earmarked for Project Obsidian in Central Oregon, which Quaise calls the world’s first commercial superhot geothermal power plant.
Schneider Electric says the deal advances its vision of creating intelligent industrial ecosystems that connect physical assets with digital insights across the asset life cycle.
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
-
A case study presented at ATCE took medical science to a new low—into the depths of the Permian Basin for application to downhole reservoir drainage diagnostics.
-
A survey of SPE members associated with a university, or their job/role to be faculty, collected information about the effect of the energy transition on recruiting students, strategic directions in academic programs, and maintaining a relevant curriculum for future careers.
-
More Students Going Into Petroleum Engineering Programs as Research Work Tilts to Alternative EnergyMore freshmen are enrolling in petroleum engineering, drawn by strong demand for graduates.
-
One is on Earth, and one is not. But the knowledge transfer between the oil patch and off-world has fueled meaningful technological advances for all involved.
-
This paper discusses how multiple reliable technologies may be used in concert to establish reasonable certainty for reserves estimates through the flexibility provided by the Petroleum Resources Management System.
-
This study compares, in a carbon capture and storage (CCS) context, the economics of a traditional business model vs. an alternative business model (a regional CCS hub separately managed by a special-purpose vehicle).
-
A surge in permit applications for long-term carbon storage sites reflects where industrially produced carbon dioxide can be harvested, and where the necessary pipelines are.
-
Cemvita and ChampionX are launching a pilot project next year to turn an old oil field into one that may yield tons of hydrogen each day.
-
The contracts awarded by ExxonMobil and Equinor are for work offshore Guyana and Brazil.
-
The captured carbon dioxide will be permanently sequestered in the Cameron Parish CO2 Hub to be located offshore Louisiana.