Onshore/Offshore Facilities
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
This paper introduces in-pipe inspection technologies enabling high-resolution digital measurements of tubular internal diameter and wall thickness for critical downhole applications.
-
This article presents a results-driven case study from an ongoing collaboration between a midstream oil and gas company and Neuralix Inc.
-
Unlike traditional inspection methods, distributed fiber-optic sensing offers continuous, real-time monitoring capabilities, allowing for early detection and response to potential leaks, which is especially crucial in remote or inaccessible locations.
-
Equinor and Shell plan to launch the joint venture—initially announced in late 2024—by the end of 2025, pending regulatory approvals.
-
North Sea tieback to the Troll C platform could begin production by the end of 2029.
-
The LNG specialist also greenlit a debottlenecking project to free up additional volumes at the Corpus Christi site.
-
Technical safety standards are essential as global offshore exploration heats up.
-
The field, which holds the first production license on the Norwegian Continental Shelf, sent oil to the Jotun FPSO on 23 June.
-
Less than 3 months after going onstream, the Barents Sea project, the northernmost production offshore Norway, is producing 220,000 B/D.
-
ExxonMobil moves forward with the decommissioning of a 25-year-old deepwater US Gulf development.
-
While militant attacks halted construction at Mozambique’s onshore megaprojects, Eni began LNG exports using a floating production strategy, which now serves as the foundation for its ongoing development.