Onshore/Offshore Facilities
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
This paper reviews a proof-of-concept project in which surplus casing pipes were used in the fabrication of purposefully designed artificial reef structures for the enhancement of biodiversity and commercial fisheries.
-
Oil major boosts its initial offer for transmission assets.
-
Project partnership eyeing an additional 10% recovery from venerable offshore field.
-
A new offshore service company has been created combining Baker Hughes’ subsea equipment operation and the drilling hardware made by MHWirth. The joint venture’s goal is to grow and go public.
-
The drilling program is the first exploration well to be drilled in production license 785 S.
-
The paper outlines specific issues, mitigation steps, and lessons learned during the development phase of a corrosion-resistant alloy pipeline.
-
High-strength, sour-service-grade carbon steel has been developed with outer diameter up to 23 in. and wall thickness up to 2.5 in. using a robust manufacturing process.
-
The offshore Equatorial Guinea project is a key step toward country’s mega hub status.
-
Massive Russian Baltic Sea gas export line faces scrutiny, sanctions from the West.
-
Transmission firms say that future-proofing the pipeline network will assist the transition to a green economy.
-
WaveCrest Energy will develop, build, and own LNG assets to service underserved markets.