Onshore/Offshore Facilities
The declaration builds on a memorandum of understanding the partners signed with Egypt in May to process Block 10 gas at the country’s LNG export and domestic gas facilities.
Alongside the new subsea awards, Equinor strengthened its position in the 400-million-bbl Bay du Nord development by acquiring BP’s interest in the project.
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
-
In this study, software that is capable of modeling fully transient multiphase flow in wellbore and pipeline has been used to characterize the fluid-hammer effects of well shut-in and startup on the coupled subsurface and surface systems.
-
As with many monitoring and decision support tools, riser management systems originate from the engineering community so may assume a large degree of domain knowledge.
-
Alternative approaches and new deployment strategies are being developed to manage water used for fracturing oil and gas wells.
-
Fiber-optic-system installations have reduced the need for intervention by logging tools and have given crucial insights into wellbore integrity and reservoir production.
-
As the world's supply of crude becomes heavier, many of the world’s oil producers will have to think more carefully about heavy crudes and the challenges they pose for processing, storage, and transportation.
-
Strong demand for natural gas is driving a recovery in liquefied natural gas (LNG) expenditures worldwide, with expenditures expected to reach USD 228 billion in the next five years.
-
In this second article of a three-part series, methods for improved quantification of operating performances of the gas gravity separation, the mist extraction, and the liquid gravity separation sections of gas/liquid separators are discussed.
-
The growing desire of offshore operators to speed up subsea field development while reducing costs has fostered many compelling innovations.
-
This paper is investigates installed cost overruns of pipeline-compressor-station projects, using data from more than 200 projects. Results of the analysis show that project size, capacity, location, and year have different impacts on individual component overruns.
-
Valuation of the enhanced flexibility offered by platform-based development solutions and sequential subsea solution is difficult. This leads to the question: Are development solutions being selected without taking sufficient account of option values?