Onshore/Offshore Facilities
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
This paper documents the testing, integration, and field deployment of a metal expandable packer used as an openhole toe isolation plug in a deepwater well under high-pressure, high-temperature conditions.
-
Two cruises were completed for DenAr Ocean Engineering for the TPAO Sakarya gasfield pipeline route investigation and site survey project.
-
The Lake Albert project includes the development of oil fields, processing facilities, and an electrically heated pipeline network.
-
Tested within a full ballast water tank on a North Sea FPSO, the ROV collected visual inspection data, validating system performance including wireless navigation and wireless communication.
-
This paper identifies success factors behind the Johan Sverdrup predrilling campaign and outlines lessons learned.
-
The authors determine that economical and environmentally responsible solutions exist for fluid disposal during well-testing operations.
-
Contractor's CB&I unit will build a pair of storage tanks for new LNG facility in Louisiana.
-
The web-based tool may be applied throughout an energy project's life cycle.
-
The facility will be a commercial-scale CO2 sequestration hub in the DJ Basin.
-
A two-armed autonomous underwater vehicle has been launched for complex inspection and maintenance tasks, embedded in a powerful IT infrastructure that enables both intuitive control and monitoring of the system and effective information flow with the plant operator.
-
This selection of papers will familiarize facilities engineers with a variety of topics so they are more prepared for what 2022 may bring.