Onshore/Offshore Facilities
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
This paper documents the testing, integration, and field deployment of a metal expandable packer used as an openhole toe isolation plug in a deepwater well under high-pressure, high-temperature conditions.
-
Final lab testing has been completed and field trials of the ultrahigh expansion bridge plug will begin by the end of this year.
-
ECA LNG will connect natural gas supply from Texas and the western US to Mexico and other countries across the Pacific Basin. First production from the project is expected in late 2024.
-
The Abu Dhabi National Oil Company announced that it has completed the first phase of its large-scale multiyear predictive maintenance project, which aims to maximize asset efficiency and integrity across its upstream and downstream operations.
-
The expanded additive manufacturing services widen the companies’ targeted industries to include oil and gas, renewables, maritime, and aerospace.
-
The agreements place most of the LNG volumes through Q1 2022 and continue ADNOC’s expansion into new LNG export markets.
-
Phase 1 covers the modeling and monitoring of assets for six ADNOC Group companies. The four phases of the project are expected to be completed by 2022.
-
Modules for the FPSO will travel to Singapore for integration. The FPSO will be located offshore Mexico, with first oil production planned for 2021.
-
An ATCE session focused on subsea and offshore subsurface applications with much wider implications. The discussion included the electrification of both facilities and subsurface systems, as well as more-extensive deployment of sensing and flow control from the surface to the reservoir.
-
Jumbo Maritime's heavy-lift crane vessel Fairplayer completed the work.
-
As it reaches for net-zero emissions, the company said its operations offshore Norway remain central to its long-term strategy.