Onshore/Offshore Facilities
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
This paper documents the testing, integration, and field deployment of a metal expandable packer used as an openhole toe isolation plug in a deepwater well under high-pressure, high-temperature conditions.
-
Cyberhawk will provide drone inspection, surveying, data visualization services, and inspection reports.
-
The Bureau of Safety and Environmental Enforcement approved the conversion of the Lena compliant tower platform into an artificial reef under the bureau’s Rigs to Reefs program.
-
The newly launched video series featuring speaker Bob Chin, the creator and editor of the OGF Savvy Separator Series of articles, provides a basic level of understanding of separator design and troubleshooting.
-
The LNG project includes development of offshore gas fields in Mozambique’s Area 1 and a liquefaction plant with a capacity in excess of 12 mtpa. The gas turbines are slated for delivery in 2H 2021 and 1H 2022, and the compressors are expected in 2021.
-
Akers BP said it will use lessons learned from the pilot and scale the remote-assist concept across its assets.
-
Breakwater’s produced-water-recycling facility has the flexibility to recycle, store, or dispose of water. It has already recycled nearly 5 million bbl of produced water in the third quarter of 2020.
-
The FPSO will be capable of processing 90,000 B/D of crude, 75 million ft3/D, 120,000 B/D of water injection, and a storage capacity of 900,000 bbl of crude oil. First oil is planned for 2021.
-
Plugging and cleaning up the open oil and gas wells in Texas could cost companies and taxpayers as much as $117 billion, according to a new report.
-
The Bubbleheads, a team of four deep-sea saturation divers, share the view of a bellman.
-
Bechtel will design the LNG facility with a final contract price proposal by spring 2021. If built, Goldboro LNG would be the largest megaproject in Nova Scotia’s history.