Onshore/Offshore Facilities
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
This paper documents the testing, integration, and field deployment of a metal expandable packer used as an openhole toe isolation plug in a deepwater well under high-pressure, high-temperature conditions.
-
Texas LNG’s CEO Vivek Chandra and ALNGE Principal Luc Speeleveld outlined key issues and concerns facing the US LNG industry now and in the future as market dynamics remain affected by COVID-19.
-
A recent test proved the feasibility of using LiDAR on remote-controlled drones to create 3D maps of the inside of tanks, increasing the safety and efficiency of inspections.
-
Goal is to reduce plant emissions profile and boost sustainability in production.
-
The meeting with project partners comes less than a month after Mammoet was awarded an unloading, transportation, and installation contract.
-
Three-dimensional seismic technology helped unlock more subsurface secrets for oil and gas operators. Now, 3D technology can be used in scanning, a cutting-edge technology that engineers can use to plan upgrades to oil and gas assets virtually.
-
With the acquisition of Magnolia LNG, along with its Texas LNG Brownsville project, Glenfarne Group expands its export capacity to 12 mpta.
-
The COVID-19 disaster and a catastrophic fall in oil prices could leave the state on the hook for billions in environmental cleanup costs if oil and gas companies go bankrupt during the health crisis, New Mexico's top land official says.
-
WFS Technologies’ collaboration is its second in as many months supporting its Seatooth technologies.
-
The complete paper discusses the systematic approach adopted by a service company to achieve the goal of safely abandoning wells offshore southwest Brazil with different completion types using light workover vessels.
-
Construction on Mozambique LNG stopped in April due to COVID-19, but Total continues work on the project even amid a $12 Billion shortfall. Financing for the Mozambique LNG project follows engineering contracts awarded by Total in the past few months.