Onshore/Offshore Facilities
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
This paper documents the testing, integration, and field deployment of a metal expandable packer used as an openhole toe isolation plug in a deepwater well under high-pressure, high-temperature conditions.
This paper presents an approach for safe, efficient, and cost-effective legacy well reabandonment.
-
This case study describes how gas condensates within a subsea tieback system behave very differently to condensed water from a wet-gas system and therefore a pseudo dry-gas system needs to be configured differently for gas-condensate developments.
-
Texas facilities get green light to export LNG. US export capacity is expected to almost double over the next 5 years.
-
This paper identifies potentially significant hidden value of subsea multiphase boosting technology, or aspects of it that have not received adequate attention during the field-development decision-making process.
-
The Dalmatian project is a brownfield development and represents the world’s longest multiphase tieback by boosting at some 35 km; the boosting system is installed at approximately 6,000 ft water depth.
-
The unseasonably warm weather in the northern hemisphere and the rise of the global supply levels has resulted in record-low LNG prices. Adding to that, the coronavirus epidemic in China has reduced business and industrial activity, with January’s LNG imports dropping by about 10% year on year.
-
The data-driven maintenance program incorporates riser condition, usage, and fatigue analysis with a risk-based inspection process.
-
This paper shows how high-frequency, real-time drilling data from wired drillpipe has helped optimization of drilling performance and achievement of additional improvements in the New Mexico Delaware Basin.
-
A producer in the Marcellus Basin selected Edge Gathering Virtual Pipelines 2 to capture and liquefy gas from its stranded wells in Tioga County. Initial operation is underway and is set to be ongoing until at least 2022.
-
Asian spot prices for LNG took a dive to multiyear lows, feeling the pressure of the lack of demand. Holders of previously agreed upon long-term buyer contracts seek renegotiation.
-
Topsides for the Peregrino C Platform in the Campos Basin offshore Brazil was installed by the world’s largest crane vessel, Heerema’s Sleipnir.