Pipelines/flowlines/risers
The awards build on Tenaris’ role in earlier phases of the ultradeepwater Black Sea project.
Engineering, procurement, construction, and installation awards made at the end of 2025 are expanding Saipem’s role in Turkey’s two largest offshore gas fields, plus Saudi Arabia’s Berri, Abu Safah, and Marjan oil fields and Qatar’s North Field gas giant in the Persian Gulf.
The Gorgon Phase 3 project aims to counter declining reservoir pressure to sustain gas supplies to Western Australia’s domestic market and support LNG exports to Asia.
-
Systematic experimental and modeling approaches to designing a safe operating strategy for a 5-km deepwater-subsea-flowline case study are presented to address unplanned shutdown and restart events for waxy-crude production.
-
Operators are increasingly recognizing the need for a systematic assessment and management of flexible pipe integrity, but the identification of critical criteria and the means to best achieve valid and efficient inspection and monitoring (I&M) continues to evolve.
Page 32 of 32