Offshore/subsea systems
FPSO is the fourth unit to go online in the deepwater pre-salt Mero field in 3 years.
The investment underscores ExxonMobil’s pivot to Nigeria’s offshore after it finalized the divestiture of its onshore assets in the country.
FLNG vessels will handle gas from the Vaca Muerta formation when they go online in 2027 and 2028 offshore Argentina.
-
The company is set to supply offshore well services and subsea systems for Vår Energi-operated fields on the Norwegian Continental Shelf.
-
Production from the field northwest of the Shetland Islands is expected to start in 2026 or 2027.
-
The authors’ work states that the qualification approach for offshore hydrogen pipeline systems should include material properties testing under various conditions.
-
This paper is a summary of a study that covers through-life economics for producing green hydrogen from offshore fixed wind turbines.
-
The authors of this paper present the results of an assessment of two regions in Uruguay suitable for bottom-fixed offshore wind technologies.
-
Over a 10-year period, sensors monitoring the motion and loads near subsea wellheads have been mounted on more than 300 drilling campaigns. Integrity parameters were calculated to assess whether subsea conductors provided the intended amount of support during drilling operations. In several of these campaigns, loss of conductor support due to integrity issues was obse…
-
Wave power plus a subsea battery can be a reliable source for subsea operations, to a point.
-
Woodside confirms key contracts for deepwater Mexican Gulf development.
-
The contractor will install flexible pipe and subsea structures on the field in Block 17 offshore Angola.
-
The final investment decision for the 2016 discovery is expected to come in early 2024.