Floating production systems
Floatover topsides installation is the latest milestone in Woodside's $12.5 billion gas project.
Operator targets first oil 30 months after field sanction of $1.5 billion heavy-oil project that will use a refurbished wellhead platform and FPSO.
FLNG vessels will handle gas from the Vaca Muerta formation when they go online in 2027 and 2028 offshore Argentina.
-
A new report shows that the offshore oil and gas sector is cautiously getting back to work, with some projects delayed and while EPC awards for sanctioned projects remain robust.
-
Energy trader Vitol also made an unspecified strategic investment in Delfin Midstream.
-
The contractor will finalize the chosen FPSO solution for the development in the Campos Basin pre-salt off Brazil.
-
Something often talked about but rarely occurs is the reuse of an existing, but idled, production platform on a new field. LLOG wants to change that with ambitions to rejuvenate the former Independence Hub floating production system for use on its Leon/Castile project in the deepwater Gulf of Mexico.
-
The sale is subject to the closing of the acquisition by BW Energy of the 100% operating working interest in the Golfinho field from Petrobras.
-
ExxonMobil and its partners now believe they have discovered 11 billion BOE.
-
Norphlet-trend discovery will be developed via a three-well subsea tieback to the Blind Faith FPU.
-
Giant gas project off Australia had been idle since last December.
-
The decision comes after an environmental review showed that the floating production, storage, and offloading vessel-based development was unlikely to cause negative environmental effects.
-
The Norwegian platform was taken off line as a precaution after an undersea earthquake shook the area.