Unconventional/complex reservoirs
This paper aims to establish a set of best practices for generating particle-size-distribution data from core samples.
This paper discusses the successful execution of two openhole gravel-pack completions in two Gulf of Mexico fields with depleted reservoirs.
By integrating experimental and mathematical modeling approaches, this work aims to advance the understanding of sand-detachment dynamics and formation instability under varying saturation conditions.
-
As the demand for energy continues to increase, so does the sociopolitical demand that these resources be produced in a sustainable way. This reflective thought has defined this month’s selection of technical papers, each speaking to a different facet of this feature’s theme: unconventional reservoir development for a sustainable energy transition.
-
This paper describes natural fractures and their effect on hydrocarbon productivity in the Vaca Muerta shale formation.
-
The authors of this paper describe a solution using machine-learning techniques to predict sandstone distribution and, to some extent, automate the process of optimizing well placement.
-
This study catalogs global gas/oil ratio data to identify currently produced light crude oils that could be rendered carbon neutral through the direct-air-capture mechanism.
-
DJ Basin player enters the Permian Basin with a pair of asset purchases from private-equity vehicles.
-
The US-based drilling contractor and well completions company will combine to form the second-biggest service company in North America.
-
A concurrent deal to sell off some of the acquired assets to Northern Oil and Gas will effectively lower the acquisition cost to $1 billion.
-
A Kimmeridge Energy executive said at the Unconventional Resources Technology Conference that he wants to "make unconventional resources investable in a low-carbon world."
-
A slate of new pipeline projects are expected to help relieve the oil-rich region's associated gas bottleneck.
-
The first long-haul overland conveyor system to deliver proppant is under construction in the Permian Basin.