Drilling/completion fluids

Tubing Failure in HP/HT Wells Investigated and Mitigated

S13Cr tubing specimens experienced stress corrosion cracking with phosphate-based completion fluids contaminated with mud and oxygen, whereas formate-based completion fluid is compatible with the tubing.

5 stress corrosion cracking test results of super 13Cr tubing in different completion fluids

Super 13Cr-110 tubing used in high-pressure, high-temperature (HP/HT) gas wells in the Tarim oil field has experienced numerous failures. After a series of investigations for root-cause analysis, the conclusion was that fracture of the tubing mechanistically is categorized as stress corrosion cracking (SCC) and is closely related to the application of phosphate-based completion fluid. Further tests indicated that Super 13Cr (S13Cr) tubing specimens experienced SCC with phosphate-based completion fluids contaminated with mud and oxygen, whereas formate-based completion fluid is compatible with S13Cr tubing. At present, 55 HP/HT gas wells in the field have used formate-based completion fluid with no tubing string fracture.

Introduction

Compared with the Gulf of Mexico, the North Sea, the South China Sea, the Qiongqiong Basin, and various Chinese oil and gas fields, the oil pipelines in the Tarim field are among the most difficult with regard to service conditions, which are characterized by extreme operating conditions such as high pump pressure and large displacement reform.

×
SPE_logo_CMYK_trans_sm.png
Continue Reading with SPE Membership
SPE Members: Please sign in at the top of the page for access to this member-exclusive content. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community to gain full access.