Testing page for app
-
On 1 June, Hardt unveiled Europe’s first hyperloop test facility on the TU Delft campus. Hardt was founded as a company by a number of the winners from Elon Musk’s hyperloop competition earlier this year. Together with the European construction company BAM, they have built a test facility for this futuristic transport system.
-
Brazing technology allows metallurgical joining of dissimilar materials by use of a filler material.
-
This work is a study of collapse pressure of perforated pipes to evaluate the effect of lateral perforations on the radial resistance of pipes under external pressure.
-
This paper presents an overview of the SACROC Unit’s activity focusing on different carbon dioxide (CO2) injection and water-alternating-gas (WAG) projects that have made the SACROC unit one of the most successful CO2 injection projects in the world.
-
This paper presents key challenges in surface-facilities-project implementation during the construction and operational-readiness phase of a project and presents results from full-field implementation.
-
This paper provides an overview of all enhanced-oil-recovery (EOR) projects in the Greater Prudhoe Bay (GPB) region and presents the process and methodology for MI allocation to these projects and to individual injection patterns.
-
By understanding the factors involved in oil droplet coalescence, the Savvy Separator engineer can assess the operational/chemical factors in the treatment system that are affecting droplet growth and make adjustments to enhance coalescence rates.
-
A test method is being developed to screen paraffin chemistries in the presence of brine, closer resembling dynamic field conditions.
-
A coiled-tubing selective perforating and activation system that transmits critical downhole data and measurements in real time is enabling well interventions that previously could not have been executed.
-
The oil and gas industry should pay more attention to mature vertical wells but it first must consider technology and cost.