ADNOC
-
ADNOC will purchase eight FlexRigs while H&P invests in ADNOC Drilling’s planned public offering.
-
The contracts will cover concept and other project engineering services for at least the next 5 years.
-
The introduction of artificial intelligence (AI) cameras on marine vessels is planned to embrace a smarter automated analytic response and reporting culture, which, in turn, is expected to lead to increased safety oversight of critical offshore operations in areas that have been determined to have a lack of physical safety coverage.
-
With only around 30 installations worldwide, ADNOC’s onshore team has seen enough results from its first “fishbone” stimulation to embark on a 10-well program that will decide a full development scheme.
-
The UAE produced 4 million B/D this year and is looking to these newly discovered resources to reach 5 million B/D by 2030.
-
The Abu Dhabi National Oil Company announced that it has completed the first phase of its large-scale multiyear predictive maintenance project, which aims to maximize asset efficiency and integrity across its upstream and downstream operations.
-
The agreements place most of the LNG volumes through Q1 2022 and continue ADNOC’s expansion into new LNG export markets.
-
The first delivery of shale gas in the UAE marks a major milestone toward its goal of reaching 1 Bcf/D by 2030. It also signals the expansion of hydraulic fracturing in the UAE’s conventional fields.
-
Phase 1 covers the modeling and monitoring of assets for six ADNOC Group companies. The four phases of the project are expected to be completed by 2022.
-
Two contracts awarded for flowlines and wellheads at ADNOC’s Abu Dhabi oil fields are expected to be completed in 5 years. A third contract to develop a bypass system for its Jebel Dhanna and Fujairah terminals is expected to be completed in 30 months.