Campos Basin
-
FPSO to be connected to high-pressure subsea separation technology pilot project.
-
Petrobras said the unit serving the pre-salt field is designed to reduce up to 24% of emissions.
-
In addition to securing the rig, Equinor has, on behalf of the partners, awarded SLB, Baker Hughes, and Halliburton agreements for drilling and well services for the Raia project worth around $109 million.
-
The facility is destined for Equinor's Brazilian pre-salt development.
-
As the vessel moves toward a shipyard to be dismantled, the company said it wants to become a global reference in decommissioning, focusing on sustainability, safety, and care for people and the environment.
-
The development scheme for BM-C-33 includes an FPSO capable of processing gas and condensate without further onshore processing.
-
The contractor will transport and install pipeline related to the Wahoo development in the Campos Basin.
-
The Anita Garibaldi was built by MODEC and will produce Marlim and Voador together with FPSO Anna Nery, already in operation.
-
The FPSO Anna Nery is the first of two floaters set to revitalize production at the Marlim field in the northeastern part of the Campos Basin offshore Brazil.
-
The Equinor-led BM-C-33 will utilize a gas processing FPSO in the Campos Basin field cluster.
Page 1 of 4