Seatrium
-
At peak, 100,000 BOE/D is expected to flow to the Whale production semisumbersible, which largely replicates the Vito semi.
-
The formal design and construction contract award comes after an LOI for the work was signed this past summer.
-
The deepwater Gulf of Mexico project in the Paleogene will require a 20K-psi production semisubmersible.