Artificial lift
Whether it’s reviving inactive gas-condensate wells or identifying overlooked reserves in brownfields, operators are making the most of older wells and fields.
Sponsored
Electrical submersible pumps (ESPs) are the backbone of artificial lift operations, enabling the extraction of hydrocarbons from challenging reservoirs. However, their effectiveness is often compromised by the extreme downhole environment, characterized by soaring temperatures, high pressures, and exposure to aggressive fluids.
ExxonMobil developed an automated system to identify nonproductive and underperforming Permian Basin wells and prioritize high-volume wells to return to production.
-
Artificial lift really shines during a downturn. This is because, when capital spending is constrained, artificial lift is one of the few levers an operator has available to increase production while reducing operating expenses.
-
An artificial-lift concept consisting of an in-well ESP as the primary method and a mudline system as backup has proved effective in an unltradeepwater heavy-oil field.
-
A plunger lift optimization software has been developed that enables set-point optimization at scale.
-
A novel PCP configuration was developed from phased design trials and experience in cold heavy-oil production with sand (CHOPS) wells. This configuration uses a modified rotor to create alternating sections of contact and noncontact within a conventional stator.
-
With the acquisition of Schlumberger’s rod lift business, Lufkin gains several products, brands, and key proprietary software.
-
Wellbore tortuosity is a term that has steadily increased in relevance to the oil and gas industry over the past decade, but its importance is especially clear in the current environment.
-
To have the flexibility to treat both rich and lean gas wells [up to 100% gas volume fraction (GVF)], a new multiphase pump system has been developed by comparing the different boosting systems performance and analyzing well-by-well production scenarios.
-
Each year at the SPE Artificial Lift Conference and Exhibition, energy professionals convene to connect, grow, and learn—and also to laud outstanding innovators in their field.
-
This paper describes a coiled tubing gas lift (CTGL) technique successfully used to restart production from two pilot wells in a mature field in Pakistan that had been shut in since 2015.
-
An AI-based application enabled operators to preempt ESP failures while optimizing production.