Drilling
Digitalization and automation of the drilling process drive the need for an interoperability platform in a drilling operation, where a shared definition and method of calculation of the drilling process state is a fundamental element of an infrastructure to enable interoperability at the rigsite.
This paper highlights a new online system for monitoring drilling fluids, enabling intelligent control of drilling-fluid performance.
A proposed integrated workflow aims to guide prediction and mitigating solutions to reduce casing-deformation risks and improve stimulation efficiency.
-
As the resources that the industry develops become increasingly challenging, access to a broader range of options and new and developing approaches allows more-efficient and -effective recovery.
-
The influx-management-envelope (IME) concept is an advanced, innovative way to assess influx conditions in managed-pressure-drilling (MPD) operations, offering an improved tool for the decision-making process.
-
This paper discusses the successful design, laboratory testing, and performance of an innovative, low-solids, organophilic-clay-free invert-emulsion fluid (OCF-IEF) used to drill the reservoir section of an extended-reach-drilling (ERD) well.
-
Current long-reach technology already has a large effect on oil recovery. Many possible improvements, however, remain, and we see new contributions every year.
-
A producer and a service company have collaborated to develop a downhole system to merge multilateral technology and intelligent completions to create “smart laterals.”
-
This paper reviews the technology trends in cement-job evaluation using logging tools and considers the main advantages and concerns associated with each technology.
-
As I read through the abstracts and papers that have been presented in the past year, I notice several key themes: verification of cement placement, development of new materials as a barrier, development of new additives to improve the cement barrier, and enhancement of existing techniques.
-
This paper reviews a successful managed-pressure-cementing (MPC) operation and presents findings and lessons learned.
-
Operators at a UAE field experienced several challenges while cementing production sections. A systematic approach was applied that used standard cementing best practices as a starting point.
-
The Peregrino project, located in the post-salt zone of the Campos Basin, presents immense challenges for drilling extended-reach wells. This paper shares challenges imposed by the well profile and downhole environment on the design and execution phases.