Drilling
Sponsored
This case study by CNOOC and Halliburton highlights how enhanced multizone sand control treats eight unequal zones in one trip and reduces completion time by 60 hours in Bohai Bay, China.
US buyers are looking for extra shale inventory and added another $18 billion in purchases in October alone.
This paper presents the application of degradable particulate-diverter technology to improve oil production by effectively diverting stimulation treatment fluids away from high-water-cut, high-permeability, high-temperature producing intervals or zones.
-
ExxonMobil, operator for the Sakhalin-1 project, planned an additional drilling campaign at the Chayvo field, Sakhalin Island, Russia.
-
In 2012, the number of unconventional tight gas/shale and high-pressure/high-temperature (HP/HT) papers continued to grow. This year, we had some very interesting developments in these and other areas of well construction.
-
This case history presents the highly challenging extended-reach deepwater well, Ursa A-10, drilled in the Ursa (Latin for bear) prospect in the US Gulf of Mexico (GOM).
-
The Eagle Ford shale in Zavala County, Texas, is similar to many high-carbonate-content oil-shale formations.
-
To maintain zonal isolation throughout the life of a high-pressure/high-temperature (HP/HT) well, the cement sheath must perform reliably at temperatures that can exceed 315°C.
-
The Granite Wash formation presents several challenges in drilling the build section from a vertical open hole to form a lateral.
-
As operators continue to drill into deeper and more-extreme formations, the demand for technologies suited to these environments increases.
-
With exploration in harsh environments and consequent high-pressure and high-temperature conditions, calculating reservoir properties has become complex and changes in pressure-transient response need to be understood and appreciated by taking appropriate measures.
-
FPWD provided a direct pressure measurement while drilling to set the lower boundary, and formation-integrity tests (FITs) with MPD provided the upper boundary.
-
We all know that things have changed significantly for offshore drilling and completion in the last 3 years. Regulations have been reviewed, and operational procedures and requirements have changed.