Drilling
ExxonMobil will retain its equity stakes in ongoing Bass Strait projects even as it hands off its operatorship responsibilities to Woodside Energy.
Thermal stimulation can accelerate the formation of shale creep barriers for long-term well integrity but only within a carefully controlled temperature window. This study identifies optimal thermal conditions for maximizing barrier performance while avoiding thermally induced shale damage.
Conflict‑driven price gains may be offset by higher costs, supply‑chain risks, and a limited appetite for new drilling activity.
-
The company’s new Retina imaging system creates high-resolution borehole images at the drill bit.
-
SponsoredAltitude Energy Partners optimized drilling efficiency by minimizing dysfunctions and protecting downhole components. Their directional drilling team ensured consistent curves and laterals through precise BHA design, modeling, and trajectory control—reducing nonproductive time and drilling costs, and achieving a 100% improvement in efficiency by pad completion.
-
Operator targets first oil 30 months after field sanction of $1.5 billion heavy-oil project that will use a refurbished wellhead platform and FPSO.
-
This paper highlights nontraditional methods to cure oil-based-mud losses in horizontal wells drilled in unconventional plays.
-
The authors of this paper write that the use of high-angle wells through anisotropic shale formations represents a promising approach to improving oil recovery while reducing the overall number of wells required.
-
This paper presents a continuous passive magnetic ranging technique that can provide real-time distance and direction to the offset well while drilling without interrupting drilling operations.
-
This paper highlights the continuous improvement of multilateral technology used in the Middle East by demonstrating how the application of a multilateral well strategy is a proven and reliable method to reduce time-intensive operations.
-
This paper addresses the deployment of an external protective coating with a rough surface profile in wells identified as susceptible to common cementing issues.
-
This paper provides examples for planning and execution of primary and remedial managed pressure cementing in deepwater drilling operations.
-
This paper presents a lost-circulation model used during design and job-evaluation phases to accurately predict top of cement and equivalent circulating densities.