Onshore/Offshore Facilities
Using case studies from Western Kazakhstan, this article shows how construction-led optimization cut installation costs by 60–70%, reduced construction scope by up to 80%, and lowered turnaround inspection labor by as much as 90%. The results improved schedule certainty, reduced risk, and increased efficiency across brownfield oil and gas facilities.
Production has begun at the company’s fifth FPSO-based development offshore Guyana just days after it sanctioned what will become its eighth project in the prolific Stabroek Block.
Of the eight ExxonMobil-led developments sanctioned to date in the Stabroek block, Longtail is the first to shift the focus from oil to gas and condensate production.
-
This study contributes to enhancing the understanding of scale-inhibitor retention in rock formations.
-
This paper compares traditional welded techniques, such as above-water repair methods and underwater hyperbaric welding, with the novel options offered by subsea connectors purposely developed for corrosion-resistant-alloy-clad pipelines.
-
This paper introduces a technology for offshore pipeline inspection centered on an autonomous robotic system equipped with underwater computer vision and edge-computing capabilities.
-
The floating liquefied natural gas ship Hilli Episeyo, currently offshore Cameroon, is planned for upgrades before redeployment to Argentina.
-
As a champion of floating natural gas liquefaction technology, Eni is positioning itself to play a major role in Africa with a fast-growing gas-liquefaction capacity targeted to reach 14 million tonnes per year by 2028.
-
The initial phase of the carbon capture and storage project has a capacity of 1.5 million tonnes per year, with a second phase—due online in 2028—expected to bring the storage capacity to 5 million tonnes per year.
-
The operator estimates discovering more than 96 million BOE of recoverable volumes with its latest Norwegian North Sea exploration activity.
-
In this final installment of the Savvy Separator Series (No. 23), the authors present a curated collection of recommended references, articles, and other key resources—a comprehensive guide worth reading, bookmarking, and keeping in your library.
-
NewMed has targeted the fourth quarter of 2025 to declare a final investment decision (FID) on Phase 1B of the Chevron-operated Leviathan gas project expansion after striking Israel’s largest ever gas export deal.
-
TotalEnergies, Global Infrastructure Partners, and NextDecade divvy up Train 4 stakes ahead of an expected FID in September.