Onshore/Offshore Facilities
War‑related infrastructure damage is beginning to influence global energy supply chains in ways that could reshape project development and capacity growth.
Sulzer and JSIL are teaming up to provide the service for oil and gas, power generation, and industrial operations.
The deal includes Waygate’s inspection portfolios and is expected to close later this year.
-
During natural gas liquefaction, CO2 must be removed to prevent icing and plugging in the system. The CO2-removal system may be the most important part of the gas-treatment system.
-
A methodology is proposed for design of subsea flowlines and risers coupled with a subsea high-integrity pressure protection system (HIPPS) for fields with high shut-in tubing pressure (SITP).
-
On the 201st anniversary of the founding of the first commercial gas operation, the Gas, Light and Coke Company (later British Gas), the future for natural gas has never looked better.
-
This paper discusses the available methodologies for remediation of a pipeline affected by sand and presents examples where the discussed methodologies have been applied.
-
Industry has overcome the technical challenges with decommissioning in shallow water. But as deepwater structures require removal, a whole new set of decommissioning challenges will require new solutions. This article highlights some of these challenges.
-
This paper presents a methodology to estimate the probability of failure of every individual corrosion defect and the residual likelihood of failure of an overall corroded pipeline segment after selected repairs, using structural probabilistic analysis.
-
Increasing gas demand and the requirement for short-term to medium-term import solutions have led to rapid growth in the floating regasification sector in recent years.
-
This paper presents the results of tests conducted to design a fast-breaking gelled fluid for a debris-removal operation in a long, large-diameter subsea pipeline in the Asia Pacific region. where traditional pigging was not an option.
-
Global decommissioning projects are ramping up as many installations near the end of their life cycle. Many operators are now planning for major removal projects. Changes in technology and regulations have caused operators to make significant shifts in well abandonment operations.
-
Semoga and Kaji fields experienced reservoir souring and suffered a history of calcium-carbonate (CaCO3) -scale cases before a proper scale-inhibition program was implemented. Problems with a free water knockout discovered continued scale issues, leading to investigation of the reasons.