Onshore/Offshore Facilities
The Granat prospect on the Norwegian Continental Shelf may be developed with a subsea tieback to existing infrastructure.
The planned facility was designed to process 34 MMcf/D of associated gas into fully refined gasoline.
The awards build on Tenaris’ role in earlier phases of the ultradeepwater Black Sea project.
-
Operators are increasingly recognizing the need for a systematic assessment and management of flexible pipe integrity, but the identification of critical criteria and the means to best achieve valid and efficient inspection and monitoring (I&M) continues to evolve.
-
The selection criteria for multiphase boosting options remain somewhat subjective. A comprehensive literature review into the working principles of the major pump types identified the intrinsic advantages and limitations of each technology for subsea and downhole applications.
Page 223 of 223