Onshore/Offshore Facilities
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
This paper reviews a proof-of-concept project in which surplus casing pipes were used in the fabrication of purposefully designed artificial reef structures for the enhancement of biodiversity and commercial fisheries.
-
Winning innovators focused on environment, safety, and operational efficiency.
-
A platform connecting to the Garden Banks pipeline was undamaged by Hurricane Laura, but Enbridge declared force majeure after inspecting the facilities.
-
Williams Companies announced a near-term goal of a 56% absolute reduction from 2005 levels in greenhouse-gas emissions by 2030, aiming for net-zero carbon emissions by 2050. Why is this significant, and where can emissions be mitigated in the midstream natural-gas gathering and boosting segment?
-
The COVID-19 pandemic accelerates transformative moments, particularly the search for the best strategy and innovation to secure offshore megaprojects not underpinned by higher oil prices.
-
The complete paper discusses a floating wind-turbine solution that is particularly cost-competitive for deepwater locations and that can unlock the possibility of deploying large wind-powered generators far from the coastline in deep water.
-
The complete paper is a comprehensive discussion of the development and deployment of the tension leg platform (TLP), one of the four major platform types that also include floating production, storage, and offloading (FPSO) vessels; semisubmersible floating production systems; and spar platforms.
-
The complete paper is an extensive review of the evolution of spar designs, focusing on the progression of work that ultimately led to the application of a transformative concept to the oil industry.
-
In the complete paper, the authors seek to understand the effect of triazine on the electrochemical response of a carbon-steel surface in a mixed-gas system.
-
The AC and DC uninterruptible power system specs were prepared with the support of the World Economic Forum. Phase 3 of the program aims to develop 40 new specifications.
-
The FEED contract is expected to be converted into an engineering, procurement, construction, and installation contract in Q1 2021.