Onshore/Offshore Facilities
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
This study aims to systematically assess casing integrity and corrosion risks associated with CO2 injection in oil-recovery operations.
-
Floatover topsides installation is the latest milestone in Woodside's $12.5 billion gas project.
-
The companies completed a technical assessment of the technology for use with floating production, storage, and offloading vessels.
-
Situated at the entrance to the Persian Gulf, Marsa LNG will anchor the Middle East’s first bunkering hub when it drops its first product in 2028.
-
The investment underscores ExxonMobil’s pivot to Nigeria’s offshore after it finalized the divestiture of its onshore assets in the country.
-
The USV Challenger will be remotely controlled from shore and will be equipped with multiple autonomous features.
-
The company has transformed its former Genesis platform into an artificial reef for marine life off the coast of Louisiana.
-
Operator targets first oil 30 months after field sanction of $1.5 billion heavy-oil project that will use a refurbished wellhead platform and FPSO.
-
FLNG vessels will handle gas from the Vaca Muerta formation when they go online in 2027 and 2028 offshore Argentina.
-
Contractor will moor the production semisub in the Keathley Canyon area of the US Gulf of Mexico.
-
This paper describes the operator’s digital-twin end-to-end production system deployed for model-based surveillance and optimization.