Pipelines/flowlines/risers
The Gorgon Phase 3 project aims to counter declining reservoir pressure to sustain gas supplies to Western Australia’s domestic market and support LNG exports to Asia.
The contract will cover the design and manufacturing of tree systems, flexible flowlines, a manifold, and controls, as well as installation of the subsea production system.
Sponsored
Advance your career with the new Pipeline Engineering Program at the Technical University of Leoben, a 5-month course combining on-campus and online learning, integrating industry expertise, engineering practice, and future-ready skills for professionals in oil, gas, and emerging energy systems.
-
There are few deepwater-pipeline operators with expertise in pipeline repairs. This paper describes a strategy developed and implemented on deepwater-pipeline intervention, based on a deepwater operational experience built over a decade.
-
This paper illustrates a numerical approach to estimate the deposition profile of precipitated wax crystals and its effect on flow-related parameters in pipelines. Options for avoiding these issues are also explored.
-
As with many monitoring and decision support tools, riser management systems originate from the engineering community so may assume a large degree of domain knowledge.
-
A program was devised to test the manufacturability of shrink-fit joints made from high-strength (greater than 100 ksi) mill pipe and forged couplings.
-
Gas production in the South China Sea has seen an increasing trend of pipelines operating in high-pressure, high-temperature (HP/HT) conditions. This has led operators to look beyond the conventional stress-based design and move into strain-based design using the lateral-buckling-design approach. This paper presents both construction challenges and operational works p…
-
As natural gas pipeline systems have grown larger and more complex, the importance of optimization of design and operation of pipelines has increased. This paper examines the optimization issue for the Egyptian gas transmission pipeline network.
-
Field trials were conducted by BP on the commercial version of wired pipe with a comprehensive suite of logging-while-drilling (LWD) tools, measurement-while-drilling (MWD) functionality, and rotary-steerable- capability on two Wyoming wells in 2007.
-
Solid-expandable tubular (SET) is widely used to patch casing and has proved to be cost effective.
-
The general industry perception is that, when drillstrings or casing strings exceed conventional helical-buckling criteria, they cannot be operated safely in the hole because the risk of failure or lockup is too high.
-
Pipelines play a vital supporting role in the energy supply chain as one of the most efficient modes of hydrocarbon transportation. Unconventional resource development and LNG have set the stage for growth in onshore pipelines.