Production
North Sea operators produced an additional 16 million BOE from 56 reinstated wells in 2025 as improved intervention efficiency lowered costs and helped restore shut-in assets to production, according to the NSTA.
This contributed article highlights the growing importance of fiber-optic sensing and its potential to advance thanks to emerging quantum technologies.
The DOE-backed EGS-Twin project aims to simulate geothermal production systems, helping operators better predict performance and maximize output.
-
JPT’s first year of publication was one of groundbreaking events that would transform the global petroleum industry. A recap of developments in 1949 emphasizes the high hopes attached to the industry—and the ambitious goals of the new magazine.
-
Engineers desperately need an alternative to acid placement through pipe, coiled tubing, or bullheading. For example, propellants have been around for years; however, their performance has not quite met the hype. Nevertheless, several case histories have been authored to suggest their efficacy; historically, some treatments have even been wildly successful.
-
The first wells from the current North Sea development project are expected online in 2026.
-
This paper addresses the challenges of integrating huge amounts of data and developing model frameworks and systematic workflows to identify opportunities for production enhancement by choosing the best candidate wells.
-
The $48.5-billion investment aims to keep the 30-year-old project in western Kazakhstan flowing for years to come.
-
Dutch leaders have voted to halt all future production from the large gas field due to seismic activity linked to extraction operations.
-
The index integrates three independent components extracted from static and dynamic parameters: reservoir permeability thickness, movable gas, and reservoir pressure from a historically matched dynamic model.
-
Supervised learning was used to develop an ensemble of models that account for historical production data, geolocation parameters, and completion parameters to forecast production behavior of oil and gas wells.
-
The $6-billion Azeri Central East (ACE) platform is the first BP-operated offshore production facility controlled from onshore.
-
The new vessels bring QatarEnergy’s fleet to 104 as the company ramps up production with its North Field expansion.