Production
The 2026 Upstream Scale Guidelines establish a common workflow for field measurements, scale modeling, and risk assessment to support more consistent operational decisions.
The long-term outlook analysis says a potential shift toward new construction could push 2026 production 3% above 2025 levels.
Lower operating expenditures and a changing asset mix helped UKCS operators cut average production costs by 9% year over year, despite relatively flat production levels, according to the NSTA.
-
A pair of innovative field development strategies are helping tame the wild, wild Permian Basin.
-
I would like to highlight the following works as promising technological developments for production and facilities: innovative measurement techniques, improvements to drilling safety, new developments in piping inspection, and a very interesting study of triangular vs. circular cross-sectional pipes.
-
This paper presents field cases of a rigless wireline logging technique that accurately locates sources of water production in cased wells with standalone sand screens in an offshore field in the Caspian Sea.
-
The produced water conundrum in the Permian Basin will be solved by a mix of recycling, disposal, and future breakthroughs in technology currently being studied.
-
The standalone FPSO destined for Senegal’s first offshore oil development is on its way to a Singapore yard for topsides integration and commissioning.
-
Cassia C is BP Trinidad and Tobago's first offshore compression platform.
-
Pemex and New Fortress Energy partner up to develop the Lakach gas field.
-
Louisiana-based Commonwealth LNG gets the green light, while Delfin LNG gets more time on the development clock.
-
The collaboration seeks to jointly develop onshore LNG modules with capacities between 1 and 2 mtpa.
-
The Permian Basin operator said the purchase ‘checks all the boxes’ it looks for in an acquisition.