Production
A multidimensional Wiener process approach predicts casing remaining useful life, enabling safe, cost-effective well life extension and repurposing for carbon dioxide injection, CCS, and geothermal applications.
Sponsored
Unwanted water production can erode well performance and asset economics if left unmanaged. Interwell’s precision water shutoff approach, grounded in diagnostics and engineered isolation, helps operators identify water-entry points, protect hydrocarbon flow, and restore sustainable well performance in mature and complex wells.
Drone strikes, refinery shutdowns, tanker disruptions, and halted LNG production have heightened concerns about broader supply risks.
-
The accurate and precise analysis of scale inhibitors—in conjunction with other field data such as ion analysis, total suspended solids, and productivity index—plays an important role in making decisions about the efficiency of scale squeeze and continuous chemical injection treatments.
-
A new study questions whether the most widely reported production data is the best indicator of future output.
-
I would like to steer readers’ attention to new technology, advanced modeling, and the interesting topic of fracture hits.
-
After 70 years of production, more than 30% of the Arab C reservoir stock-tank original oil in place has been recovered through various mechanisms including natural depletion, waterflooding, gas lift implementation, and horizontal-well development.
-
This paper describes the first job in southeast Asia in developing horizontal-well placement in a turbidite environment.
-
This paper discusses the successful, fully integrated, 3D Earth modeling (EM) and dynamic reservoir simulation of the Hollin Formation in the Lago Agrio Field within an operator’s first producer field in Ecuador.
-
Approaches to integrated investigative testing and root cause identification are discussed to prevent solid emulsions from stabilizing to impair flowlines and other field infrastructure.
-
With declining trends in production and dwindling reserves for a 35-year-old offshore field, the Samarang Redevelopment Project was initiated with a vision toward implementing integrated operations as an asset-management decision-support tool.
-
Unconventional production patterns in the Permian Basin are leading producers to replace electrical submersible pumps (ESPs) with gas lift, which had been little used there.
-
Mekers Offshore, a Zhejiang-based company, launched its first in a series of liftboats at Shanghai Bestway Dajin Heavy Industries yard in Jiangsu, China.