Offshore/subsea systems
North Sea tieback to the Troll C platform could begin production by the end of 2029.
The field, which holds the first production license on the Norwegian Continental Shelf, sent oil to the Jotun FPSO on 23 June.
Less than 3 months after going onstream, the Barents Sea project, the northernmost production offshore Norway, is producing 220,000 B/D.
-
The collaborative virtual asset and data management suite is designed to meet the needs of the offshore renewable energy market and oil and gas subsea asset owners.
-
Production from the Dover field is expected to start in late 2024 or early 2025.
-
The contractor will supply flowline and connectors as part of a project on the Angolan field.
-
The paper presents predicted vs. measured wear for six wells in the Culzean field, a high-pressure/high-temperature gas condensate field in the central North Sea.
-
Three-year plus options deal could generate around $50 million in revenues for subsea contractor.
-
The deepwater US Gulf of Mexico is the template for Shell's Whale development due online in 2024.
-
The new floater is producing oil from the Itapu field in the Santos Basin
-
Talos turns to Louisiana-based engineering firm for upgrades to tension-leg platform in the US Gulf of Mexico.
-
Aker BP submitted the NOAKA development plan along with 10 other investments on the Norwegian shelf that collectively represent one of the largest private industrial developments in Europe.
-
Operator also moves forward with electrification of the Njord field.