Offshore/subsea systems
The North Sea project, which is sending production to the nearby Ivar Aasen platform, came online 9 months ahead of schedule.
Equinor said it found between 14 million and 24 million BOE with its most recent exploration well in the Polynya Tubåen prospect.
BP sanctioned development of the Kaskida in 2024, with first oil from the high-pressure project expected in 2029.
-
The 100 million BOE-plus find will be tied back to the Heidelberg spar.
-
One is on Earth, and one is not. But the knowledge transfer between the oil patch and off-world has fueled meaningful technological advances for all involved.
-
The contracts awarded by ExxonMobil and Equinor are for work offshore Guyana and Brazil.
-
Shell has tapped the contractor to conduct engineering, procurement, construction, and installation work on the large gas field offshore Trinidad and Tobago.
-
The job will increase the Heerema vessel’s second main hoist capacity by 1200 mt.
-
The subsea field tied back to Grane is expected to produce 60,000 B/D at peak.
-
Aker Solutions, SLB, and Subsea 7 have joined to create a subsea engineering firm to drive innovation and efficiency in subsea production.
-
The authors of this paper discuss the effectiveness of smaller port sizes and the use of dummy and Venturi valves to enhance gas lift performance and maximize recovery in mature offshore fields.
-
The company is set to supply offshore well services and subsea systems for Vår Energi-operated fields on the Norwegian Continental Shelf.
-
Production from the field northwest of the Shetland Islands is expected to start in 2026 or 2027.