Floating production systems
Floatover topsides installation is the latest milestone in Woodside's $12.5 billion gas project.
Operator targets first oil 30 months after field sanction of $1.5 billion heavy-oil project that will use a refurbished wellhead platform and FPSO.
FLNG vessels will handle gas from the Vaca Muerta formation when they go online in 2027 and 2028 offshore Argentina.
-
The operator will move forward with its multibillion-dollar Northern Hub project while planning for additional exploration drilling in the region.
-
Phase 2 of the fast-track project expected to quadruple output to 60,000 BOPD by year-end.
-
Both new and old vessels are benefiting from automation processes that can improve operational efficiency, predict downtime, and debottleneck workflows using a flurry of crucial data points.
-
A newbuild Fast4Ward hull will be used as part of the Block 58 development set for FID prior to year-end.
-
The deepwater Gulf of Mexico project in the Paleogene will require a 20K-psi production semisubmersible.
-
Mooring operations underway following arrival of the GTA FPSO on-site at the maritime border of Mauritania and Senegal.
-
The massive vessel moved from Aker Solutions quayside to begin sea trials ahead of deployment in the Barents Sea prior to year-end.
-
The set of new-generation FPSOs will be delivered in 2029 equipped with technologies that can cut greenhouse emissions by 30% given the unit’s all-electric configuration.
-
At the 2024 Offshore Technology Conference, industry giants like ExxonMobil, Equinor, and Petrobras offered a look at the future of low-carbon floating production, storage, and offloading units.
-
Enhancement to the drillship comes ahead of work commitment on Shell's Sparta development in the US Gulf of Mexico, its first in the Gulf to produce from 20K reservoirs.