Woodside Energy Ltd. awarded TechnipFMC a significant integrated engineering, procurement, construction, and installation (iEPCI) contract worth between $75 and $250 million for the development of the Lambert Deep and Phase 3 of the Greater Western Flank fields, located offshore Northwestern Australia.
TechnipFMC will design, manufacture, deliver, and install subsea equipment including subsea production system, flexible flowlines, and umbilicals for connection to the Angel platform, located about 120 km north-west of Karratha and connected to the North Rankin Complex (NRC) via a 50-km subsea pipeline.
This is the second contract under the 5-year iEPCI frame agreement between TechnipFMC and Woodside announced in 2019.
TechnipFMC was previously awarded an iEPCI™ contract by Woodside in October for the development of the Pyxis and Xena fields, located offshore North West Australia for the design, manufacture, deliver and install subsea equipment including subsea production system, flexible flowlines and umbilicals.