Testing page for app
-
Strategy changes are needed to overcome the oil and gas sector’s current economic challenges.
-
A key aspect of the project discussed in this paper is the use of minimal initial-production facilities to achieve significant early production from each of four preconstructed artificial islands.
-
This paper presents the development of Sapinhoá field, covering the fast-track transition and decision-making process, from appraisal to conceptual and basic engineering of the Sapinhoá pilot project and on to its subsequent execution, highlighting the challenges, lessons learned, and results.
-
In organic shales, hydraulic fracturing is important for optimizing the production of horizontal wells. For a standalone lateral, the propped surface should be maximized to increase production. In the case of a pad, well spacing is an additional factor.
-
Understanding petrophysical properties well enough to make drilling decisions, particularly for tight gas can be a challenge. A new computer system aims to help analyze the extensive data involved.
-
In this eighth articles of the series, level settings and control in gravity separators are addressed.
-
InterMoor appointed Joe Price as country manager for InterMoor Canada. Price holds 14 years of experience in the offshore oil and gas industry, working on the engineering, procurement, construction, and installation of mobile and permanent mooring systems with operators and contractors. He holds a degree in ocean and naval architectural engineering from Memorial Unive…
-
ADNOC and BP will collaborate to form an earth surface technology center in Abu Dhabi. ADNOC has also reformed its stage gate process for advancement of new technologies.
-
New leadership aims to make positive, lasting changes at RPSEA.
-
This paper offers an alternative explanation for the early boundary-dominated flow related to dissolution of salt-sealed natural fractures in the shale.