Onshore/Offshore Facilities
As the pace of new discoveries slows and high-quality prospects become harder to find, oil companies may need to rely more heavily on mature fields to maintain production and support future supply.
With confidence in subsea boosting performance growing, BP is incorporating pumping systems into both greenfield developments and brownfield expansions.
This paper presents an approach for safe, efficient, and cost-effective legacy well reabandonment.
-
The USV Challenger will be remotely controlled from shore and will be equipped with multiple autonomous features.
-
The company has transformed its former Genesis platform into an artificial reef for marine life off the coast of Louisiana.
-
Operator targets first oil 30 months after field sanction of $1.5 billion heavy-oil project that will use a refurbished wellhead platform and FPSO.
-
FLNG vessels will handle gas from the Vaca Muerta formation when they go online in 2027 and 2028 offshore Argentina.
-
Contractor will moor the production semisub in the Keathley Canyon area of the US Gulf of Mexico.
-
The Offshore Technology Conference has announced the 2025 Spotlight on New Technology Award winners—nine game-changing innovations shaping the future of offshore energy. Join the celebration at 1600 CDT on Monday, 5 May, at the NRG Center, Houston.
-
Updates about global exploration and production activities and developments.
-
This paper describes the operator’s digital-twin end-to-end production system deployed for model-based surveillance and optimization.
-
The authors of this paper describe a project to develop a virtual sensor to monitor the cooling effect downstream of a subsea choke to avoid hydrate plugs during cold-start operations.
-
SLB is introducing a new electric well-control system to replace larger conventional, fluid‑controlled hydraulic equipment.