Reservoir
The UAE project is expected to produce up to 345 MMscf/D by 2029, with expansion potential to 1 Bcf/D.
This study investigates the potential for in-situ hydrogen generation from hydrocarbons using in-situ combustion, with particular emphasis on the role of kerogen content and heating mode.
This paper presents the application of degradable particulate-diverter technology to improve oil production by effectively diverting stimulation treatment fluids away from high-water-cut, high-permeability, high-temperature producing intervals or zones.
-
A US oil company is using its in-house laboratory's digital imaging devices to analyze reservoir rocks in new plays to answer questions raised by complex tight oil formations that cannot be answered using routine core testing methods.
-
Refracturing older unconventional wells is likely to reward those willing to investigate the reasons why production declines and what can be done to restore it, according to George King, distinguished engineering adviser at Apache Corp.
-
Flowback (or cleanup) of fracturing treatments can have a profound influence on well productivity in unconventional reservoirs. The process of cleanup crosses many discipline boundaries.
-
This paper discusses fracture stimulation in the first joint-venture shale-gas project with foreign companies in China.
-
In 2010, exploration of gas-rich and possibly liquid-rich shale reservoirs began in northern Mexico. A two-stage integrated workflow was developed to achieve set objectives.
-
In this paper, a strategy for designing a novel small-molecule CO2 thickener is detailed.
-
This paper investigates the use of gelling CO2/water emulsions, stabilized by silica nanoparticles, to control the mobility of CO2.
-
This study presents experimental results on the use of carbon dioxide (CO2) as an enhanced-oil-recovery (EOR) agent in preserved, rotary sidewall reservoir core samples with negligible permeability.
-
This paper presents a pragmatic integrated work flow used to optimize development and guide critical development decisions in the Black Hawk field.
-
Angola’s Block 17 is nearing the end of one era of development and the beginning of its next.