Well integrity/control

The second phase of the project will analyze data gathered in Phase 1, with the goal of improving riser, wellhead, and conductor fatigue estimates.
Regulators told some injection well operators close to the epicenter of a magnitude 4.0 earthquake that they will have to shut down their operations indefinitely.
A high-resolution acoustic downhole evaluation system nabs top award for 2023.

Page 2 of 10